Project portal
Proof of careful work
Every checkpoint below is logged against the stage it belongs to. Photos appear here only when they are really taken on the job — never filled in by us.
Proof mode
Surface check Not started yet
Walls and trim inspected before anything is touched.
Nail holes repaired Not started yet
Holes filled and flush — the first invisible fix.
Cracks repaired Not started yet
Cracks opened, filled and smoothed so they don't telegraph through.
Sanding completed Not started yet
Patched areas sanded smooth and dust removed.
Spot primed Not started yet
Repairs sealed with primer so the topcoat lays even.
Floor protection Not started yet
Floors, furniture and fixtures masked before the first can opens.
Coat 1 Not started yet
The first full coat, photographed wet.
Coat 2 Not started yet
The finish coat — full, even coverage.
Final inspection Not started yet
The walkthrough standard, documented before handover.