HUETURA
(825) 964-4310

Project portal

Proof of careful work

Every checkpoint below is logged against the stage it belongs to. Photos appear here only when they are really taken on the job — never filled in by us.

Proof mode

  • Surface check Not started yet

    Walls and trim inspected before anything is touched.

    Ask about a stage

  • Nail holes repaired Not started yet

    Holes filled and flush — the first invisible fix.

    Ask about a stage

  • Cracks repaired Not started yet

    Cracks opened, filled and smoothed so they don't telegraph through.

    Ask about a stage

  • Sanding completed Not started yet

    Patched areas sanded smooth and dust removed.

    Ask about a stage

  • Spot primed Not started yet

    Repairs sealed with primer so the topcoat lays even.

    Ask about a stage

  • Floor protection Not started yet

    Floors, furniture and fixtures masked before the first can opens.

    Ask about a stage

  • Coat 1 Not started yet

    The first full coat, photographed wet.

    Ask about a stage

  • Coat 2 Not started yet

    The finish coat — full, even coverage.

    Ask about a stage

  • Final inspection Not started yet

    The walkthrough standard, documented before handover.

    Ask about a stage